Please confirm you are human

This browser or connection looks automated. Press and continuously hold the control for 3 seconds to enable Google-hosted web results and, when separately allowed, AI-assisted answers.

A successful check enables 100 search requests. Interactive access does not authorize scraping, systematic collection, or reuse of search output.

Hold with a pointer, or hold Space or Enter.

News

FOX 5 DC
fox5dc.com > news > metros-red-line-returns-normal-3-stations-reopen-monday

Metro's Red Line returns to normal as 3 stations reopen Monday

1+ week, 1+ hour ago   (366+ words) Normal Red Line operations return Monday morning to the Bethesda, Medical Center and Grosvenor-Strathmore stations following the completion of a nine-week heavy construction project. The work included building a new mezzanine structure at Bethesda Station to connect with the future…...

FOX 5 DC
fox5dc.com > news > metros-summer-red-line-shutdown-wraps-up-amid-purple-line-construction

Metro’s summer Red Line shutdown wraps up amid Purple Line construction

1+ week, 2+ day ago   (349+ words) Metro’s summer shutdown of three Red Line stations will end, with the Bethesda, Medical Station and Grosvenor-Strathmore stations reopening Sept. 7. WASHINGTON - The Metro station shutdowns that have interrupted commutes for thousands of DMV residents are nearly complete. The three Red…...